How long does a whole-home remodel take in Garrett Park?

Natalie’s answer

“In Garrett Park, a whole-home remodel runs 9 to 19 months end to end, from your first design conversation through move-in, with a median of about 12 months across completed MOSS projects. That full span covers design, Montgomery County permitting, and on-site construction together, the build itself is only one part of it.”

A whole-home remodel in Garrett Parktypically runs 9 to 19 months from your first design conversation through move-in, with a median of around 12 months, figures drawn from 48 completed MOSS whole-home remodeling projects across the DMV region. That full span breaks into three distinct phases: design and selections (usually 2 to 4 months),permitting and approval (roughly 1 to 2 months), and on-site construction. The build itself, while the most visible phase, is only one portion of that total timeline.

Where your project lands within that 9-to-19-month range depends on several factors specific to Garrett Park. Scope and structural complexity matter most, a project touching every room and reconfiguring load-bearing walls simply requires more time than a finish-level refresh. On the permitting side, Montgomery County's Department of Permitting Services typically takes 20 to 30 days from submission to approval for straightforward projects, but if plan revisions are needed, each additional review cycle adds 7 to 10 business days. Garrett Park's tree preservation ordinances can also introduce an extra layer of coordination if your plans affect significant trees. Beyond approvals, long-lead materials, custom cabinetry, windows, specialty fixtures, commonly run 10 to 16 weeks, and older homes in established neighborhoods like Garrett Park frequently surface surprises once walls open, from outdated electrical systems to original plumbing that needs addressing before finish work can begin.

MOSS's design-build model is specifically structured to compress this timeline wherever possible. Because our design, architecture, and construction teams work as a single integrated unit, permit documents are prepared and submitted earlier than they would be under a traditional architect-then-contractor sequence. We identify long-lead materials during the design phase and place orders before permits are even in hand, so those items arrive at or near the start of construction rather than stalling it midway through. That coordination is what keeps the median project at 12 months rather than drifting toward the longer end of the range.