Skip to content
Camp Alger ave Home Addition — project hero

Camp Alger Ave Home Addition

Location

Falls Church, VA

Completed

Feb 2025

Investment

$200K - $300K

“This comprehensive home addition project in Falls Church, VA, transformed the property with a thoughtfully designed structural expansion featuring a luxurious master bathroom suite…”

Camp Alger ave Home Addition · Falls Church, VA

The Story

The Vision Behind This Project

The Challenge

This comprehensive home addition project in Falls Church, VA, transformed the property with a thoughtfully designed structural expansion featuring a luxurious master bathroom suite.

◆ Why Homeowners Choose MOSS

1,143

Reviews

Verified

4.7★

Rating

Average

25+

Years

Serving Falls Church

“Trusted by Falls Churchfamilies since 2001”

The Team

Design + Build Team for this Project

Delivered by Team Invicta

Smiling blonde woman in black shirt and pearl earrings against a blurred modern kitchen.

Senior Project Developer

Gini Wood

Headshot of a smiling man with a beard in a suit jacket against a blurred modern kitchen background.

Senior Project Architect

Edmund Ault

A young woman with long dark hair and a black blazer smiles subtly in front of a blurred modern interior.

Senior Project Designer

Yara Barut

A woman with long brown hair smiles faintly, wearing a blue shirt and heart pendant, against a blurred modern kitchen background.

Senior Project Manager

Sherry DiCostanzo

A man with grey hair and a goatee, wearing a light grey MOSS t-shirt, smiling at the camera in front of a blurred room.

Project Manager

Jim Hayes

Man in a blue MOSS polo shirt against a blurred kitchen background.

Project Manager

Roberto Saucedo

A smiling man with grey hair and a beard, wearing a grey shirt, against a blurred kitchen background.

Project Manager

Scott Sutherlin

A man with crossed arms wearing a black polo shirt, standing in front of a blurred modern kitchen.

Project Manager

Travis Keller

A man with a mustache in a dark t-shirt against a blurred modern kitchen.

Project Craftsman

Jose Munoz

A bald man with a thick salt-and-pepper beard wearing a gray t-shirt, standing in a modern kitchen.

Project Craftsman

Joseph Gangi

A man with a reddish beard and grey shirt smiling in front of a modern kitchen.

General Manager

Kevin Shea

Smiling man with dark hair and light stubble, wearing a white shirt, against a blurred kitchen background.

Senior Project Craftsman

Riery Cespedes

Client Reviews

What Our Clients Say

“In 2024, Moss B&D built an addition of about 680 ft2 over our garage and Family Room. They worked with us to design the addition, with attention to fixtures and livability issues with lots of suggestions and a 3D house model for comparison. The addition was a large bedroom with vaulted ceiling, wood floors, picture window with overhead accent window, two walk-in closets, a small office/nursery room, a large bathroom with toilet, walk-in shower, air jacuzzi tub, and counter with 2 nice sinks. This required a supporting beam above the garage, and a number of other fixes to the family room to comply with Fairfax code. The addition has a separate HVAC system which allows better than one degree F control for the bedroom. Electrical contractors were extremely helpful, adding a sub-panel for the addition, as well as many suggestions for convenience, etc.; including extra outlets for the garage (not all in the contract) and suggestions for lighting (indirect and direct for the vaulted ceiling bedroom). My spouse LOVES the bedroom and closets (we had the walk-in closets fitted with a high-end Elfa system so we don't need chest of drawers or dressers- technically a separate job from this; but included in the design stage)- But her love for the bathroom is closer to ecstatic. A year later she continues to tell me she loves the bathroom at least once a week. It's a major win. As with ANY large project there were touchups and minor corrections (such as added insulation on pipes in a hidden crawlspace) needed after the job was completed (even a couple we didn't see for as long as a 10-11 months). There were a few 'home fixes on the contract that were in the agreement; but not part of the addition, such as a new whole house water shutoff, quarter turn valve that they needed to be reminded of. However, Moss expedited every one of those without complaint or delay. We've had bathrooms renovated and added, kitchens renovated and walls moved before in other homes. This was by FAR the best experience we've had with any construction. We will use them again. The cost was in line with what we expected (we expected about $5-600/sq ft in Falls Church VA; we feel we did very well (about $425/ sq ft!) on this project, since we included significant HVAC plumbing, electrical and other costs. All the workers were courteous, fairly on time with estimated arrival times, etc. The only delay was due to items that were shipped incorrectly; and none of the delays (again, we expect some) were delivery issues with vendors we specified; and none exceeded 2- weeks. Shockingly, for me, they finished only 2 weeks later than the estimated completion date. And that was only some minor issues that did not affect our use of the space.”

Joe Hiller

January 2026 · via Google

Curated Selections

Materials & Finishes

Materials & Finishes

Services Performed

Home AdditionBathroom RenovationStructural Engineering & DesignFoundation & Concrete WorkFraming & CarpentryRoofingSiding InstallationWindow & Door InstallationElectrical SystemsHVAC InstallationPlumbing SystemsTile InstallationHardwood FlooringInterior Trim & FinishingPainting

Ready to Begin?

Love What We Did on Camp Alger ave Home Addition?

Your Falls Church home addition project could be next. MOSS has been crafting exceptional spaces across DC, Maryland, and Virginia for over 25 years.