Camp Algier Project — project hero

Camp Algier Project

Location

Falls Church, VA

Completed

Oct 2025

Investment

$100K - $150K

“This comprehensive upper-level renovation in Falls Church, VA transformed two full bathrooms along with adjacent hallway and bedroom spaces. The project included complete demolitio…”

Camp Algier Project · Falls Church, VA

The Story

The Vision Behind This Project

This comprehensive upper-level renovation in Falls Church, VA transformed two full bathrooms along with adjacent hallway and bedroom spaces. The project included complete demolition and reconstruction of both bathrooms, featuring a luxurious walk-in tiled shower in the master suite and a tub/shower combination in the hall bath. All new plumbing rough-ins and fixtures were installed, including Kohler vanities, faucets, and a bidet seat in the master bathroom. The scope extended beyond the bathrooms to include removal of existing carpeting throughout the upper level, installation of hardwood flooring on the landing, stairs, and bedrooms (sanded and stained to match existing floors), and luxury vinyl plank flooring in both bathrooms. Electrical upgrades brought the system to code with 12 new recessed lights installed throughout, plus infrastructure for three ceiling fans in the bedrooms. The finishing touches included installation of eight new swing doors (five solid core), two sets of bypass closet doors, complete drywall patching, and fresh paint on all walls, ceilings, and trim across the entire upper level.

◆ Why Homeowners Choose MOSS

1,144

Reviews

Verified

4.7★

Rating

Average

25+

Years

Serving Falls Church

“Trusted by Falls Churchfamilies since 2001”

Client Reviews

What Our Clients Say

“In 2024, Moss B&D built an addition of about 680 ft2 over our garage and Family Room. They worked with us to design the addition, with attention to fixtures and livability issues with lots of suggestions and a 3D house model for comparison. The addition was a large bedroom with vaulted ceiling, wood floors, picture window with overhead accent window, two walk-in closets, a small office/nursery room, a large bathroom with toilet, walk-in shower, air jacuzzi tub, and counter with 2 nice sinks. This required a supporting beam above the garage, and a number of other fixes to the family room to comply with Fairfax code. The addition has a separate HVAC system which allows better than one degree F control for the bedroom. Electrical contractors were extremely helpful, adding a sub-panel for the addition, as well as many suggestions for convenience, etc.; including extra outlets for the garage (not all in the contract) and suggestions for lighting (indirect and direct for the vaulted ceiling bedroom). My spouse LOVES the bedroom and closets (we had the walk-in closets fitted with a high-end Elfa system so we don't need chest of drawers or dressers- technically a separate job from this; but included in the design stage)- But her love for the bathroom is closer to ecstatic. A year later she continues to tell me she loves the bathroom at least once a week. It's a major win. As with ANY large project there were touchups and minor corrections (such as added insulation on pipes in a hidden crawlspace) needed after the job was completed (even a couple we didn't see for as long as a 10-11 months). There were a few 'home fixes on the contract that were in the agreement; but not part of the addition, such as a new whole house water shutoff, quarter turn valve that they needed to be reminded of. However, Moss expedited every one of those without complaint or delay. We've had bathrooms renovated and added, kitchens renovated and walls moved before in other homes. This was by FAR the best experience we've had with any construction. We will use them again. The cost was in line with what we expected (we expected about $5-600/sq ft in Falls Church VA; we feel we did very well (about $425/ sq ft!) on this project, since we included significant HVAC plumbing, electrical and other costs. All the workers were courteous, fairly on time with estimated arrival times, etc. The only delay was due to items that were shipped incorrectly; and none of the delays (again, we expect some) were delivery issues with vendors we specified; and none exceeded 2- weeks. Shockingly, for me, they finished only 2 weeks later than the estimated completion date. And that was only some minor issues that did not affect our use of the space.”

Joe Hiller

January 2026 · via Google

Curated Selections

Materials & Finishes

Materials & Finishes

Services Performed

Bathroom RenovationHardwood Flooring InstallationLuxury Vinyl Plank FlooringElectrical System UpgradesPlumbing InstallationCustom Tile WorkInterior PaintingDoor Installation

Ready to Begin?

Love What We Did on Camp Algier Project?

Your Falls Church bathroom renovation project could be next. MOSS has been crafting exceptional spaces across DC, Maryland, and Virginia for over 25 years.