Skip to content
Rolfe Place Project — project hero

Rolfe Place Project

Location

Alexandria, VA

Completed

Jul 2026

Investment

$75K - $100K

“This full kitchen remodel in Alexandria, Virginia transformed an outdated space into a thoughtfully redesigned culinary hub. The scope began with a comprehensive demolition — remov…”

Rolfe Place Project · Alexandria, VA

The Story

The Vision Behind This Project

The Challenge

This full kitchen remodel in Alexandria, Virginia transformed an outdated space into a thoughtfully redesigned culinary hub. The scope began with a comprehensive demolition — removing existing soffits, cabinetry, countertops, hardwood flooring, and the original pantry — followed by a partial wall cutout to open the kitchen to the adjacent family room. New framing, drywall, and interior trim were installed to define the refreshed layout, with all new walls finished and blended seamlessly into the existing home.

◆ Why Homeowners Choose MOSS

1,143

Reviews

Verified

4.7★

Rating

Average

25+

Years

Serving Alexandria

“Trusted by Alexandriafamilies since 2001”

Client Reviews

What Our Clients Say

“Moss, thank you for the kitchen update. It was everything we wanted! Jon got the team together early and everyone was patient with us. This was our first remodel/update ever in our home. The 1995-era kitchen was terrible (just look at the pictures! Old kitchen in yellow. Yuck!). Miyuki, as designer, had to be super patient with us newbies. She listened to our desires and concerns and sent us renderings. But she went above and beyond. We never even considered moving our refrigerator. Still, she sent us a rendering to consider with it replacing our pantry. We were concerned about losing a pantry’s worth of space. She assured us we’d gain back space with the new cabinets going all the way up to the ceiling and the built-in cabinets against a wall that previously was only a desk. Boy oh boy, was she ever right! We had no idea how much a simple appliance move would open up the kitchen. (And the water line move was minimal as our half-bath is directly below where the fridge now is.) We ended up going with her suggestion. I’m sure we would have loved our kitchen as we first envisioned it, but every day when I walk in I am so glad we went with her fridge-move idea! Cristobal, as senior project manager, kept us—most importantly my wife who was at home daily—up to date on what was being done. And whenever we had an issue come up, he was quick to fix it or explain why it had to be done a certain way. The best ever was our “pass-through” window above the sink overlooking the dining/living room. We were afraid they wouldn’t be able to expand it. He assured us it could be. (Many of our neighbors were told the pass-through was stuck at a sad 2’x3’.) I’m now looking at our dining/living room from the sink, through a 3’x4.5’ opening. Again, we didn’t really comprehend what a difference such a small change would make. Brady, as the day-to-day project manager, kept all of Moss’s employees on task. He very clearly explained to my wife what was happening daily. He made sure the stove was installed as soon as it was ready so we could use our kitchen before all the punch-list items were complete. Even better, our dog loved him. And our dog usually doesn’t like men! Louie (and we) thanks you, Brady! This will not be the last time we contract with Moss for an update in our home. We have two 1995-era bathrooms staring us in the face daily, with gross contractor-grade, cheap cabinets, faucets, sinks, etc. Then we walk into our beautiful new kitchen and think: Bathrooms next! Talk to you soon, Jon, Miyuki, Cristobal and Brady.”

Mike Tyson

October 2026 · via Google

Worked with Jon Parisi, Miyuki Carter, Cristobal Brenner, Brady Lewis

Curated Selections

Materials & Finishes

Materials & Finishes

Kitchen The kitchen strikes a balance between warm craftsmanship and everyday function, anchored by semi-custom cabinetry with all-plywood box construction, dovetail drawer boxes, full-extension soft-close glides, and Top Knobs hardware throughout. Quartz countertops provide a durable, refined work surface, while a ceramic tile backsplash — installed in a classic horizontal or brick pattern — adds texture and visual continuity between the upper and lower cabinetry runs. The undermount kitchen sink is the RVH6530GG, paired with a Ferguson-sourced faucet and a dedicated garbage disposal, all tied into new Uponor PEX supply lines. Appliances include a KitchenAid 36-inch counter-depth refrigerator (KRFC302ESS), a GE gas range (PGB910SETISS), a KitchenAid 24-inch dishwasher (KUDE20FXSS3), and a 30-inch over-the-range microwave. Six LED recessed lights on a three-way dimmer, together with LED under-cabinet lighting on a dedicated dimmer switch, complete the layered lighting plan.

Ready to Begin?

Love What We Did on Rolfe Place Project?

Serving Alexandria homeowners with over 7,361 completed projects and 25+ years of trusted craftsmanship. Schedule a free consultation to discuss your vision.